{"id":8970,"date":"2020-08-19T09:44:03","date_gmt":"2020-08-19T09:44:03","guid":{"rendered":"http:\/\/preview.aquajet.se\/?post_type=jobreport&amp;p=8970"},"modified":"2020-08-19T09:44:03","modified_gmt":"2020-08-19T09:44:03","slug":"canadian-contractor-pushes-limits-of-hydrodemolition","status":"publish","type":"jobreport","link":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/","title":{"rendered":"Canadian contractor pushes limits of Hydrodemolition"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong>More than 400 miles north of Winnipeg, the Keeyask Generation Project is being constructed on the lower Nelson River. The 695-megawatt hydroelectric generating station, scheduled for completion in 2021, will be a source of renewable energy, producing an average of 4,400 gigawatt hours of electricity each year. The energy produced will be integrated into Manitoba Hydro\u2019s electric system for use in Manitoba and to export to other jurisdictions. Throughout its construction, now in its seventh year, the project has managed a number of location-specific challenges.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_6.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-8977\" src=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_6-525x700.jpg\" alt=\"Aquajet on location jobreport customer hydrodemolition concrete repair aqua cutter ecoclear canada job project hydroelectric generating station operation\" width=\"300\" height=\"400\" \/><\/a><\/p>\n<p>One such challenge occurred in 2017 when water in a 24-inch pipe in the intake froze, damaging an 8-foot-thick concrete pier. To minimize impact to the overall project, Keeyask managers opted to use <a href=\"https:\/\/aquajet.se\/hydrodemolition\/\">Hydrodemolition<\/a> to remove the damaged section. The job required a specialized contractor, one able to leverage all of their experience and equipment to overcome environmental and logistical challenges, while delivering quality results.<\/p>\n<p>&nbsp;<\/p>\n<p>Water Blasting &amp; Vacuum Services Inc., a Canadian industrial cleaning specialist, secured the contract based on a plan that provided not only the efficiency to complete the 4,944-cubic-foot (140-cubic-meter) removal work on time, but recycled nearly 80% of the water. With Aquajet\u2019s industry-leading technology, combined with years of experience, Water Blasting &amp; Vacuum Services pushed the boundaries of Hydrodemolition to work deeper and cleaner than any Canadian project to date.<\/p>\n<p>&nbsp;<\/p>\n<h3>Clear Advantage<\/h3>\n<p>Water Blasting &amp; Vacuum Services began operations more than three decades ago providing household cleaning products, but quickly branched out to include high-pressure cleaning services for industrial, municipal and commercial entities when it recognized a need for innovative, customer-focused solutions in these applications. As industrial cleaning services grew to become a core market for the company, ensuring employee safety in increasingly hazardous environments encouraged management to explore robotic options.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cThe safety of our team members has always been paramount,\u201d said Luc Laforge, president and owner of Water Blasting &amp; Vacuum Services. \u201cMany industrial cleaning applications require long hours in confined spaces and specialized PPE, like forced air systems and chemical protective suits. We wanted to take advantage of any opportunity where we could send in a machine instead of a person.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>While its first Hydrodemolition machines were bought used and converted in-house to meet the cleaning challenges of mills and other industrial facilities, the company quickly realized the benefits of working with an original equipment manufacturer to increase precision, safety and efficiency.<a href=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_5.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-8976 alignright\" src=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_5-700x525.jpg\" alt=\"Aquajet on location jobreport customer hydrodemolition concrete repair aqua cutter ecoclear canada job project hydroelectric generating station operation\" width=\"500\" height=\"375\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>\u201cOur old equipment kept the team safe and got the job done, but with most plants slowing down for routine maintenance during the same few months, we needed to find a way to maximize efficiency,\u201d Laforge said.<\/p>\n<p>&nbsp;<\/p>\n<p>With one of their pieces of Aquajet equipment \u2014 an <a href=\"https:\/\/aquajet.se\/products\/aqua-cutter-410a\/\">Aqua Cutter 410A<\/a> \u2014 Laforge saw an 80% increase in efficiency, taking a routine scrubber cleaning application from a 30-hour process to just five.<\/p>\n<p>&nbsp;<\/p>\n<p>The power and efficiency of the 410A and additional Aquajet equipment, including a <a href=\"https:\/\/aquajet.se\/products\/aqua-cutter-710v\/\">710V<\/a>, allowed Water Blasting &amp; Vacuum Services to branch out into Hydrodemolition, hydromilling and other applications, greatly increasing the company\u2019s service offerings. Over time, a reputation for delivering creative solutions and timely, high-quality results with minimal environmental impact propelled the company to the forefront of the Canadian Hydrodemolition industry \u2014 and opened the door for even more challenging projects.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h3>Clear Choice<\/h3>\n<p>That reputation put Water Blasting &amp; Vacuum Services on the shortlist for a local hydroelectric company in need of a specialized solution for an unexpected concrete removal job that threatened to delay the project.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cThis was a very intriguing project \u2014 the first of its kind,\u201d said Maurice Lavoie, general manager at Water Blasting and Vacuum Services and site manager for the project. \u201cThe pier was solid concrete, 8 feet thick, 40 feet wide and 30 feet tall at the highest point. A portion of the structure needed to be removed and re-poured. No one in Canada \u2014 very few in the world \u2014 had used Hydrodemolition to vertically remove 8-foot-thick concrete. But that was just the start when it came to the complexities and challenges of this job.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>Location was another key challenge. The construction site was approximately 2,500 miles (4,000 kilometers) from the contractor\u2019s headquarters in Edmundston, New Brunswick, and 450 miles (725 kilometers) north of Winnipeg, Manitoba. Limited access needed to be carefully factored into any proposed solution. While project managers could provide access to water, power or other general construction supplies, getting specialty equipment or replacement parts presented a time-consuming challenge. Contractors needed dependable equipment and a fully stocked toolbox to limit any unnecessary downtime.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cThe project had a lot of challenges to overcome,\u201d Lavoie said. \u201cThe remote location left us with no access to technicians or spare parts if something were to go wrong. On top of that, we would be dealing with subzero temperatures that could easily get down to 40 below. You had to have a lot of confidence in your team and your equipment to even submit a bid.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>Strict environmental controls also limited contractors\u2019 application choices. The project partners, known as the Keeyask Hydropower Limited Partnership \u2014 which includes four Manitoba First Nations and Manitoba Hydro \u2014 had made <a href=\"https:\/\/aquajet.se\/enviroment\/\">environmental protection<\/a> a cornerstone of the overall project. So, while the original brief specified Hydrodemolition as an acceptable process, the contractors would need to ensure all <a href=\"https:\/\/aquajet.se\/water-treatment-2\/\">wastewater was properly collected and treated<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cWhatever technique we used, we had to ensure there would be no negative impact on the surrounding environment,\u201d Lavoie said. \u201cLimiting environmental impact is always an important part of any project for our company, but, when combined with this project\u2019s remote location, we knew there would be additional challenges. From previous experience on a jobsite at the Muskrat Falls Generating Project in Labrador, we knew hauling water in and out was an option, but it was costly and inefficient. Treating the water onsite and reusing was the most economical and environmentally friendly solution. And with the Aquajet <a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">EcoClear<\/a> we already had the right machine to make it work.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h3>Clear Solution<a href=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_4.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-8975 alignright\" src=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_4-700x525.jpg\" alt=\"Aquajet on location jobreport customer hydrodemolition concrete repair aqua cutter ecoclear canada job project hydroelectric generating station operation\" width=\"400\" height=\"300\" \/><\/a><\/h3>\n<p>The <a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">EcoClear<\/a> water filtration system, in combination with Water Blasting &amp; Vacuum Services\u2019 extensive experience and expert logistics, allowed the contractor to present a revolutionary solution to project managers \u2014 one that promised maximum productivity while minimizing resource consumption and protecting the environment.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-8973 alignright\" src=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_2-700x525.jpg\" alt=\"Aquajet on location jobreport customer hydrodemolition concrete repair aqua cutter ecoclear canada job project hydroelectric generating station operation\" width=\"400\" height=\"300\" \/><\/a><\/p>\n<p>Water Blasting &amp; Vacuum Services purchased the <a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">EcoClear<\/a> system in 2017 as a more efficient and cost-effective alternative to hauling wastewater with vacuum trucks for off-site treatment. The system neutralizes water pH and reduces turbidity to allow safe release back into the environment. It has the capacity to move up to 88gpm, or about 5,238 gallons (20 cubic meters) per hour.<\/p>\n<p>&nbsp;<\/p>\n<p>However, for the hydroelectric power project, rather than treating and releasing the water, Water Blasting &amp; Vacuum Services proposed using the <a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">EcoClear<\/a> as part of a closed loop system that would recycle the water back to its <a href=\"https:\/\/aquajet.se\/products\/aqua-cutter-710v\/\">Aqua Cutter 710V<\/a>. It would be the company\u2019s first time using the EcoClear to <a href=\"https:\/\/aquajet.se\/water-treatment-2\/recirculation-of-water\/\">recycle water<\/a> on such a large scale, but Lavoie and his team were confident the EcoClear and <a href=\"https:\/\/aquajet.se\/products\/aqua-cutter-710v\/\">710V<\/a> would make the perfect pair to tackle the challenging application.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cThis project put our people and equipment to the test,\u201d Lavoie said. \u201cThere were a lot of firsts, but we knew we had the experience and the support of the Aquajet team to take our plan from theory to reality.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h3>Clearing a Path<\/h3>\n<p><a href=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-8974\" src=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_3-525x700.jpg\" alt=\"Aquajet on location jobreport customer hydrodemolition concrete repair aqua cutter ecoclear canada job project hydroelectric generating station operation\" width=\"400\" height=\"533\" \/><\/a>Water Blasting &amp; Vacuum Services arrived at the jobsite in March 2018. With temperatures averaging -20.0 degrees Fahrenheit (-29 degrees Celsius) and dipping as low as -40 degrees Fahrenheit (-40 degrees Celsius) at times, a hoarding system and heaters had to be set up around the demolition site to provide shelter and keep the pumps operating. In addition to the <a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">EcoClear<\/a> system and <a href=\"https:\/\/aquajet.se\/products\/aqua-cutter-710v\/\">710V<\/a>, the contractor used a spreader bar and additional tower sections to maximize the Hydrodemolition robot\u2019s reach from the standard 23 feet to 40 feet. An extension kit allowed the contractor to make a 12-foot-wide cut, as well. These enhancements greatly reduced the downtime frequent repositioning would have required. Additionally, Water Blasting &amp; Vacuum Services employed additional lance sections to increase efficiency and allow the 8-foot depth the project required.<\/p>\n<p>&nbsp;<\/p>\n<p>Steve Ouellette, lead supervisor at Water Blasting &amp;Vacuum Services, was put in charge of the closed loop system with two 21,000-gallon tanks providing water to the <a href=\"https:\/\/aquajet.se\/products\/aqua-cutter-710v\/\">Aqua Cutter 710V<\/a>. Wastewater was directed to a low point then pumped to the <a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">EcoClear<\/a>. Once the water was treated, it was pumped back to the holding tanks for reuse. In a 12-hour shift, Water Blasting &amp; Vacuum Services removed an average of 141 cubic feet (4 cubic meters) of concrete and used an estimated 40,000 gallons of water. Of this, roughly 20% of the water was lost during the Hydrodemolition process due to evaporation and absorption into the concrete. However, Water Blasting &amp; Vacuum Services was able to collect and recycle the remaining 80% \u2014 32,000 gallons \u2014 with the <a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">EcoClear<\/a> system. Over the course of the project, the <a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">EcoClear<\/a> processed more than 1.3 million gallons of water.<\/p>\n<p>&nbsp;<\/p>\n<p>Water Blasting &amp; Vacuum Services worked with project managers to integrate demolition into the complex timeline of the overall project, completing the work in two multi-week phases. Lavoie and his team operated the<a href=\"https:\/\/aquajet.se\/products\/aqua-cutter-710v\/\"> Aqua Cutter<\/a> daily for almost an entire 12-hour shift, working in 12-foot-wide sections to completely demolish the wall. A separate crew would come on at night to remove rebar and debris. The process repeated for approximately 41 days of blasting and a total of 53 days onsite.<\/p>\n<p>&nbsp;<\/p>\n<h3>Powering Through to New Opportunities<\/h3>\n<p>Water Blasting &amp; Vacuum Services completed demolition in May 2018. Thanks to a revolutionary and expertly executed plan, as well as innovative equipment, the removal did not disrupt the timeline of the overall project.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cProjects like that are once in a lifetime,\u201d Laforge said. \u201cThanks to a dedicated team with the experience and daring to take on the impossible and innovative equipment, we were able to find a unique solution that allowed us to push the boundaries of Hydrodemolition and be part of such an important construction.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>And while Water Blasting &amp; Vacuum Services waits for the next first-of-its-kind project, Laforge and his elite team plan to continue expanding their Hydrodemolition experience with innovative processes and cutting-edge equipment from Aquajet.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<h3>Short facts<\/h3>\n<p>Location: Keeyask Generating Station, Manitoba, Canada.<br \/>\nDuration: 53 days.<br \/>\nMaterial demolished: 140 m3 of concrete.<br \/>\nWater Recycled: Estimated 1,325,000 gallons (5,016 m3).<br \/>\nEquipment: Aqua Cutter 710V, EcoClear.<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<h3>More information<\/h3>\n<p><a href=\"https:\/\/aquajet.se\/products\/aqua-cutter-710v\/\">Aqua Cutter 710V<\/a><\/p>\n<p><a href=\"https:\/\/aquajet.se\/products\/ecoclear\/\">Ecoclear<\/a><\/p>\n<p><a href=\"https:\/\/aquajet.se\/water-treatment-2\/\">Water treatment process<\/a><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<h3>Printable pdf<\/h3>\n<p><a href=\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/AQS-ON91_on-location_hydro-powered-solution-in-Canada_web.pdf\">Aquajet On location &#8211; Canadian contractor pushes limits of Hydrodemolition<\/a><\/p>\n","protected":false},"featured_media":8972,"template":"","class_list":["post-8970","jobreport","type-jobreport","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.2 (Yoast SEO v26.5) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Canadian contractor pushes limits of Hydrodemolition - Aquajet<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Canadian contractor pushes limits of Hydrodemolition\" \/>\n<meta property=\"og:description\" content=\"More than 400 miles north of Winnipeg, the Keeyask Generation Project is being constructed on the lower Nelson River. The 695-megawatt hydroelectric generating station, scheduled for completion in 2021, will be a source of renewable energy, producing an average of 4,400 gigawatt hours of electricity each year. The energy produced will be integrated into [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/\" \/>\n<meta property=\"og:site_name\" content=\"Aquajet\" \/>\n<meta property=\"og:image\" content=\"https:\/\/aquajet.se\/wp-content\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"700\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/\",\"url\":\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/\",\"name\":\"Canadian contractor pushes limits of Hydrodemolition - Aquajet\",\"isPartOf\":{\"@id\":\"https:\/\/aquajet.se\/de\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_1-1.jpg\",\"datePublished\":\"2020-08-19T09:44:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#breadcrumb\"},\"inLanguage\":\"de-DE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de-DE\",\"@id\":\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#primaryimage\",\"url\":\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_1-1.jpg\",\"contentUrl\":\"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_1-1.jpg\",\"width\":1600,\"height\":700,\"caption\":\"Aquajet on location jobreport customer hydrodemolition concrete repair aqua cutter ecoclear canada job project hydroelectric generating station operation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Hem\",\"item\":\"https:\/\/aquajet.se\/de\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Canadian contractor pushes limits of Hydrodemolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/aquajet.se\/de\/#website\",\"url\":\"https:\/\/aquajet.se\/de\/\",\"name\":\"Aquajet\",\"description\":\"Proven Hydrodemolition Equipment\",\"publisher\":{\"@id\":\"https:\/\/aquajet.se\/de\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/aquajet.se\/de\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de-DE\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/aquajet.se\/de\/#organization\",\"name\":\"Aquajet\",\"url\":\"https:\/\/aquajet.se\/de\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de-DE\",\"@id\":\"https:\/\/aquajet.se\/de\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/aquajet.se\/bed\/uploads\/2021\/11\/aquajet_logo-5.png\",\"contentUrl\":\"https:\/\/aquajet.se\/bed\/uploads\/2021\/11\/aquajet_logo-5.png\",\"width\":262,\"height\":35,\"caption\":\"Aquajet\"},\"image\":{\"@id\":\"https:\/\/aquajet.se\/de\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Canadian contractor pushes limits of Hydrodemolition - Aquajet","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/","og_locale":"de_DE","og_type":"article","og_title":"Canadian contractor pushes limits of Hydrodemolition","og_description":"More than 400 miles north of Winnipeg, the Keeyask Generation Project is being constructed on the lower Nelson River. The 695-megawatt hydroelectric generating station, scheduled for completion in 2021, will be a source of renewable energy, producing an average of 4,400 gigawatt hours of electricity each year. The energy produced will be integrated into [&hellip;]","og_url":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/","og_site_name":"Aquajet","og_image":[{"width":1600,"height":700,"url":"https:\/\/aquajet.se\/wp-content\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_1-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/","url":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/","name":"Canadian contractor pushes limits of Hydrodemolition - Aquajet","isPartOf":{"@id":"https:\/\/aquajet.se\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#primaryimage"},"image":{"@id":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#primaryimage"},"thumbnailUrl":"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_1-1.jpg","datePublished":"2020-08-19T09:44:03+00:00","breadcrumb":{"@id":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#breadcrumb"},"inLanguage":"de-DE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/"]}]},{"@type":"ImageObject","inLanguage":"de-DE","@id":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#primaryimage","url":"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_1-1.jpg","contentUrl":"https:\/\/aquajet.se\/bed\/uploads\/2020\/08\/Aquajet_WaterBlasting_canada_1-1.jpg","width":1600,"height":700,"caption":"Aquajet on location jobreport customer hydrodemolition concrete repair aqua cutter ecoclear canada job project hydroelectric generating station operation"},{"@type":"BreadcrumbList","@id":"https:\/\/aquajet.se\/de\/jobreport\/canadian-contractor-pushes-limits-of-hydrodemolition\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Hem","item":"https:\/\/aquajet.se\/de\/"},{"@type":"ListItem","position":2,"name":"Canadian contractor pushes limits of Hydrodemolition"}]},{"@type":"WebSite","@id":"https:\/\/aquajet.se\/de\/#website","url":"https:\/\/aquajet.se\/de\/","name":"Aquajet","description":"Proven Hydrodemolition Equipment","publisher":{"@id":"https:\/\/aquajet.se\/de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aquajet.se\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de-DE"},{"@type":"Organization","@id":"https:\/\/aquajet.se\/de\/#organization","name":"Aquajet","url":"https:\/\/aquajet.se\/de\/","logo":{"@type":"ImageObject","inLanguage":"de-DE","@id":"https:\/\/aquajet.se\/de\/#\/schema\/logo\/image\/","url":"https:\/\/aquajet.se\/bed\/uploads\/2021\/11\/aquajet_logo-5.png","contentUrl":"https:\/\/aquajet.se\/bed\/uploads\/2021\/11\/aquajet_logo-5.png","width":262,"height":35,"caption":"Aquajet"},"image":{"@id":"https:\/\/aquajet.se\/de\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/aquajet.se\/de\/wp-json\/wp\/v2\/jobreport\/8970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aquajet.se\/de\/wp-json\/wp\/v2\/jobreport"}],"about":[{"href":"https:\/\/aquajet.se\/de\/wp-json\/wp\/v2\/types\/jobreport"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aquajet.se\/de\/wp-json\/wp\/v2\/media\/8972"}],"wp:attachment":[{"href":"https:\/\/aquajet.se\/de\/wp-json\/wp\/v2\/media?parent=8970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}