Wir bieten Spitzentechnologie für die schwierigsten Aufgaben. Sehen Sie sich einige unserer Kundenberichte über ihre Erfahrungen mit Aquajet und unseren Geräten an. Lassen Sie sich inspirieren!
How a hydrodemolition contractor repaired a tunnel despite a pandemic and winter weather Duration: 2 weeksProject Status: CompletedMaterial Removed: 42 cubic metersDates: February 1-13, 2021Equipment: Aqua Cutter 710V, HP pumpLocation: Elewijtsesteenweg 8 in Zemst, BelgiumCrew Size: Two – one operator and one machinist for the pump In Europe, some of the first signs of infrastructure […]
Learn moreLocation: La Robla, SpainDate: September 2021Duration: 26 daysMaterial Demolished: 1,440 metersEquipment: Aquajet Ergo, Hammelman high-pressure pump During an annual maintenance shutdown, a cement plant in the village of La Robla, Spain, needed an effective way to repair a 100-meter-tall, 16-meter-diameter concrete silo used to store raw materials. Similar to many silos built in the 20th […]
Learn moreWith decades of experience in new construction and commercial renovation, general contractor and construction manager Arguson Projects Inc. understood the logistical challenges posed by a multi-year, multi-million dollar parking garage renovation in Toronto’s East End. The 39-year-old structure — an open-air parkade with a roof deck, two suspended slabs and asphalt on grade — needed […]
Learn moreThe Pensacola Bay Bridge, also known as the Three-Mile Bridge, connects downtown Pensacola to Gulf Breeze, Florida. The four-lane bridge is a major artery of US Highway 98 across Pensacola Bay. The bridge structure is built on piles which support a system of trophies, support beams and a cast-in-place concrete bridge deck. In […]
Learn moreNo matter the project — from a simple structure to a massive, multi-million-dollar bridge system — efficient construction requires thorough planning. But, even with flawless logistics, projects can run into challenges that put deadlines in jeopardy. Construction is currently underway in the Philippines on a massive bridge system connecting Cebu City with Cordova […]
Learn moreThe project was the largest Hydrodemolition undertaking in the state’s history. With a number of bridge decks on I-70 between Cove Fort and Sevier showing signs of significant wear, the Utah Department of Transportation (UDOT) knew they were looking at a major repair operation. The 20-mile project included replacing the deck concrete on 14 […]
Learn more